Project Name | Izmir Refinery Old Pier New Dolphin Construction Work |
Project Location | Aliaga-Izmir, TURKEY |
Employer | Turkiye Petrol Rafinerileri A.S. (TUPRAS) |
Main Contractor | Ark Insaat San. ve Tic. A.S. (ARK INSAAT) |
Subcontractor | KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI. |
Commencement | 15.09.2021 |
PROJECT SCOPE
-
Construction Works:
- New Berthing Dolphin pile driving and superstructure works
- Installation of marine furniture
- Steel construction works
- Manufacturing anti corrosive protective wrap for steel piles (in and out of the sea)
- Boring works at the sea
Mechanical Works:
- Supply, disassembling & installation of 1×100 ton & 3×75 ton quick release hooks & winches at pier no.201
- Supply & installation of 2×75 ton quick release hooks & winches at pier no.2
Instrumentation Works:
- Supply, installation & commissioning of hook status information tracking system (Monitoring system)
Electrical Works:
- Electrification works for changes of 6 quick release hooks & winches at pier no. 201
- Electrification works for berthing of 185-meter ships to pier no. 2