CEYHAN WEST (OLD) PIER REINFORCEMENT, EXTENSION AND BREAKWATER CONSTRUCTION PROJECT

Project Name Ceyhan West (Old) Pier Reinforcement, Extension and Breakwater Construction Project
Project Location Ceyhan-Adana, TURKEY
Employer Toros Tarim Sanayi ve Ticaret A.S.
Main Contractor Tekfen Insaat ve Tesisat A.S.
Subcontractor KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Commencement 20.10.2021
PROJECT SCOPE
  • Driving of 126 nos, Ø762 mm, t=16 mm steel tubular piles
    Driving of 18 nos, Ø812,8 mm, t=12 mm steel tubular piles
    Driving of 120 nos, Ø1422,4 mm, t=22 mm steel tubular piles
    Driving of 198 nos, Ø1524 mm, t=22 mm steel tubular piles
    Driving of 1 nos, Ø2200 mm, t=32 mm steel tubular piles
    Dynamic capacity test on piles (PDA test)
  • Tugboat Pier reinforced concrete superstructure works
  • 80000 DWT Platform reinforced concrete superstructure works
  • Loop 3 & Loop 4 reinforced concrete superstructure works
  • Mooring Dolphins reinforced concrete superstructure works
  • Structural steel works
  • Access road precast works
  • Approach Trestle & Pipe Stock Site structural steel works
  • Existing platform dismantling works
  • Liquid Dolphin renovation & reinforcement works
  • Breakwater & crownwall construction