CEYHAN WEST (OLD) PIER REINFORCEMENT, EXTENSION AND BREAKWATER CONSTRUCTION PROJECT
Project Name | Ceyhan West (Old) Pier Reinforcement, Extension and Breakwater Construction Project |
Project Location | Ceyhan-Adana, TURKEY |
Employer | Toros Tarim Sanayi ve Ticaret A.S. |
Main Contractor | Tekfen Insaat ve Tesisat A.S. |
Subcontractor | KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI. |
Commencement | 20.10.2021 |
PROJECT SCOPE
- Driving of 126 nos, Ø762 mm, t=16 mm steel tubular piles
Driving of 18 nos, Ø812,8 mm, t=12 mm steel tubular piles
Driving of 120 nos, Ø1422,4 mm, t=22 mm steel tubular piles
Driving of 198 nos, Ø1524 mm, t=22 mm steel tubular piles
Driving of 1 nos, Ø2200 mm, t=32 mm steel tubular piles
Dynamic capacity test on piles (PDA test) - Tugboat Pier reinforced concrete superstructure works
- 80000 DWT Platform reinforced concrete superstructure works
- Loop 3 & Loop 4 reinforced concrete superstructure works
- Mooring Dolphins reinforced concrete superstructure works
- Structural steel works
- Access road precast works
- Approach Trestle & Pipe Stock Site structural steel works
- Existing platform dismantling works
- Liquid Dolphin renovation & reinforcement works
- Breakwater & crownwall construction