1915 CANAKKALE BRIDGE PROJECT, TEMPORARY JETTY CONSTRUCTION AT DRY DOCK SECTION
Project Name 1915 Canakkale Bridge Project, Temporary Jetty Construction at Dry Dock Section
Project Location Gelibolu-Canakkale, TURKEY
Employer General Directorate of Highways / Republic of Turkey
Consultant Tekfen – T Engineering (TT JV) Joint Venture
Main Contractor Daelim Industrial Co. Ltd. (“Daelim”), Limak Insaat Sanayi ve Ticaret A.S. (“Limak”), SKEngineering & Construction Co. Ltd. (“SKEC”) and Yapi Merkezi Insaat ve Sanayi A.S. Joint Venture
Subcontractor KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Commencement 29.07.2020
Completion 23.11.2020
PROJECT SCOPE
  • Driving of 76 nos Ø1000 mm, t=16 mm onshore steel tubular piles
  • Driving of 70 nos Ø1400 mm, t=16 mm onshore steel tubular piles
  • Driving of 4 nos Ø1400 mm, t=22 mm offshore steel tubular piles
  • Excavation and backfilling works of 6.800,00 m³
  • Reinforced concrete works of 2 berths in dimensions of 52 x 22 m
  • Installation of 5 bollards with 35 t capacity, 24 berth fenders and 4 donut fenders at sea.