SÖNMEZ CEMENT PORT CONSTRUCTION
Project Name      SÖNMEZ CEMENT PORT CONSTRUCTION
Main Contractor KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Contractor  KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Commencement 13.04.2016
Completion  04.2017
PROJECT SCOPE
  • Construction of piled jetty and dolphins (9.842 m²)
  • Driving steel tubular piles with 1219 mm OD and 14 mm WT with length varying between 27 m to 32 m (391 no’s)
  • Installation of fenders, bollards and quick release hooks
  • Formwork workmanship (25.083 m²)
  • Fabrication of steel reinforcement (2.480 ton)
  • Casting In-situ Concrete (30.377 m³)