MUSLU PORT CONSTRUCTION

 

Project Name Zonguldak Muslu Port Construction
Project Location Zonguldak / TURKEY
Employer Eren Enerji Holding
Main Contractor KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Commencement 12.05.2008
Completion 04.06.2012
PROJECT SCOPE
  •  525 m2 Ro-Ro Ramp, 28 1016/14 mm driven piles (740m)
  •  9600 m2 Piled Jetty-1, 366 1320,8/22mm driven piles (17695m)
  • 6000 m2 Piled Jetty-2, 270 1219,2/16mm driven piles (9556m)
  • 6 Mooring Dolphins, with each 8 raking piles from 1016-1118 mm OD and 16-18 mm WT (1898m)
  • 16 Belt Conveyor dolphins, 52 1016/16mm driven piles (2261m)
  • Up to 175000 DWT with 500 m turning basin.