LIKIT KIMYA OFFSHORE TERMINAL PROJECT
Project Name | LIKIT KIMYA OFFSHORE TERMINAL PROJECT |
Employer | LİKİT KİMYA INC. |
Main Contractor | MAG CONSULTANCY |
Subcontractor | KORFEZ MARINE CONSTRUCTION CO |
Commencement | 13.11.2019 |
Completion | 15.12.2020 |
PROJECT SCOPE
- Driving Ø1219,2 mm steel tubular piles by total length of 2.300 meters (92 pcs)
- Drilling of project piles up to rocky soil and anchoring last 5 m of the piles by total amount of 2.760 m
- Production of superstructure and casting concrete 2.600 m3
- Construction 8 no’s of dolphin and 1 pumping platform
- Production and placement of slab top equipments. (Catwalk, fender, crane, lightning rod …. etc.)
- Laying of 6.000 m offshore pipeline to discharging tankers that berthed to terminal.