KABATAS TRANSFER
HUB PROJECT
HUB PROJECT
Client | Istanbul Ustyapi Insaat ve Ticaret A.S. |
Main Contractor | KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI. |
Commencement | 09.11.2015 |
PROJECT SCOPE
- Quay Construction:
- Driving of 339 pcs Ø914,4 mm; t=12mm steel tubular piles, rock socket with Soilmec RT3-STAll reinforced concrete works for construction of 580 meters length quay, placing precast elements4000 tons of rebar work10500 m^3 concrete casting
- Pier Construction:
- Driving of 266 pcs Ø1117,6 mm; t=18 mm steel tubular piles, rock socket with Wirth PBA 818All reinforced concrete works for construction of 3 different piers and placing precast elements1500 tons of rebar work8000 m^3 concrete casting
- Soil Improvement Works:
- Construction of f600 mm, 13000 pcs of various lengths jet-gout columns in the offshore construction siteDriving of 36 pcs Ø914,4 mm; t=12mm steel tubular piles for transition slab supports.