HALIC METRO CROSSING BRIDGE
Project Location | Istanbul / Turkey |
Main Contractor | Astaldi-Gulermak Joint Venture |
Contractor | KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI. |
Commencement | 20.11.2008 |
Completion | 14.09.2013 |
PROJECT SCOPE
- Driving steel tubular piles with 2500 mm OD , 50 mm WT with length varying between 59,5m to 89 m and Total length of piles 4205 m
- Fabrication of steel reinforcement(2545 tons)
- Casting in-situ concrete of piles (10788 m 3 )
- Testing of piles with Ostorberg O-Cell Method (3 no’s)