HALIC METRO CROSSING BRIDGE

 

Project Location Istanbul / Turkey
Main Contractor Astaldi-Gulermak Joint Venture
Contractor KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Commencement 20.11.2008
Completion     14.09.2013
PROJECT SCOPE
  • Driving steel tubular piles with 2500 mm OD , 50 mm WT with length varying between 59,5m to 89 m and Total length of piles 4205 m
  •  Fabrication of steel reinforcement(2545 tons)
  •  Casting in-situ concrete of piles (10788 m 3 )
  • Testing of piles with Ostorberg O-Cell Method (3 no’s)