CONSTRUCTION OF SAVA BRIDGE OF SREMSKA RACA-KUZMIN SECTION (SARAJEVO-BELGRADE MOTORWAY PROJECT)
Project Name | Construction of Sava Bridge of Sremska Raca-Kuzmin section (Sarajevo-Belgrade Motorway Project) |
Project Location | Belgrade, SERBIA |
Employer | The Ministry of Construction, Transportation and Infrastructure of the Republic of Serbia-“Roads of Serbia” |
Main Contractor | Tasyapi Insaat Taahhut Sanayi Ticaret A.S. |
Subcontractor | KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI. |
Commencement | June 2020 |
Completion | 04.09.2021 |
PROJECT SCOPE
- Construction of pylons of river crossing bridge located on the Sava River.
- Driving of 56 Nos Ø1500mm diameter bored piles via polymer drill slurry.
- Construction and dismantling of temporary cofferdam structures which consist of over 1.000 t steel fabrication with an area of 700 m² for each river pylon.
- Casting of 12.800m³ reinforced concrete and 1.550-ton rebar installation.