BURJ AL ARAB ISLAND
DEVELOPMENT PROJECT
Project Name BURJ AL ARAB ISLAND DEVELOPMENT PROJECT
Project Location  DUBAI / UAE
Employer  Jumeriah Group
Main Contractor Projectslink
Contractor KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Commencement  18.11.2015
Completion  30.03.2015
PROJECT SCOPE
  •  Driving steel tubular piles 914 mm OD , 19 mm WT with 25 m length (90 pieces) by hydrolic hammer
  • Testing of piles with PDA / Restrike
  •  Conduction of kathodic protection
  •  Replacement and renewal of damaged SHED )Shepherd Hill Energy Dissipators) Units throughout Burj Al Arab Island by marine operations.The SHEDs (Total 3370 pcs) are artificial protector layer against wave, flodd etc