BURJ AL ARAB ISLAND
DEVELOPMENT PROJECT
DEVELOPMENT PROJECT
Project Name | BURJ AL ARAB ISLAND DEVELOPMENT PROJECT |
Project Location | DUBAI / UAE |
Employer | Jumeriah Group |
Main Contractor | Projectslink |
Contractor | KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI. |
Commencement | 18.11.2015 |
Completion | 30.03.2015 |
PROJECT SCOPE
- Driving steel tubular piles 914 mm OD , 19 mm WT with 25 m length (90 pieces) by hydrolic hammer
- Testing of piles with PDA / Restrike
- Conduction of kathodic protection
- Replacement and renewal of damaged SHED )Shepherd Hill Energy Dissipators) Units throughout Burj Al Arab Island by marine operations.The SHEDs (Total 3370 pcs) are artificial protector layer against wave, flodd etc