EMINONU-ALIBEYKOY TRAM LINE PROJECT
Employer I.B.B Rayli Sistemler Daire Baskanlıgi Avrupa Yakasi Rayli Sistem Mudurlugu
Control Metro Istanbul San. ve Tic. A.S.
Main Contractor Dogus İnsaat ve Ticaret A.S.
Contractor Ento Madencilik Insaat San. ve Tic. LTD. STI.
Subcontractor KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Start Date 26.06.2017
Completion 01.06.2021
PROJECT SCOPE
  • KYK-1 ROAD BRIDGE WITH STEEL TUBULAR PILE
    Driving of 153 units steel tubular piles Ø914,4mm; t=12mm, Total weight of steel piles 2100ton
    Drilling of 153 units steel tubular piles Ø914,4mm; t=12mm, Total lenght of drilling 8600meter
  • KYK-2 ROAD BRIDGE WITH STEEL TUBULAR PILE
    Driving of 540 units steel tubular piles Ø914,4mm; t=12mm, Total weight of steel piles 7640ton
    Drilling of 540 units steel tubular piles Ø914,4mm; t=12mm, Total lenght of drilling 31400mete
  • KYK-3 ROAD BRIDGE WITH STEEL TUBULAR PILE
    Driving of 121 units steel tubular piles Ø914,4mm; t=12mm, Total weight of steel piles 950ton
    Drilling of 121 units steel tubular piles Ø914,4mm; t=12mm, Total lenght of drilling 4150meter