Project Name | 1915 Çanakkale Bridge Wet Dock Construction |
Project Location | Çanakkale / TÜRKİYE |
Employer | ÇOKİYİ A.Ş. |
Main Contractor | DLSY (DAELIM-LİMAK-SK-YAPI MERKEZİ) ADİ ORTAKLIĞI |
Subcontractor | KÖRFEZDENİZ İNŞAAT TAAH. SAN. VE TİC. LTD. ŞTİ. |
Commencement | 16.01. 2018 |
Completion | 10. 01. 2019 |
PROJECT SCOPE
- Construction of access bridge and 4 no’s of dolphins
- Driving 139 no’s steel tubular piles 1600 mm OD, 25 mm WT with various length between 34m-52,5 m
- Execution of Pile Dynamic Tests (PDA) on 15 project piles
- Manufacturing and installation of steel super structure consist of HEB1000/HEB340/HEB300/HEB200 profiles and various steel plates
- Manufacturing and installation of 190 no’s precast slabs
- Casting concrete 2772 m3
- Fabrication of Steel Reinforcement 400 ton
- Installation of 3684 no’s Ø19/300 mm stud nails
- Installation of 55262 no’s Ø19/150 mm stud nails
- Installation of 20 no’s marine fenders
- Supply and installation of 11 no’s 35t/50t marine bollards
- Installation of 32 no’s Mooring/Berthing Winch, Sheave, Swivel head and Wire Stopper