Scope of Work
*Berth B construction:
*Driving of 508 pcs Ø1422.4 mm t=18 mm steel pipe piles (approx. 22,860.00 m),
*Construction of a 450 m x 37 m quay (including precast slabs and beams),
*Placement of underwater fill beneath the quay and formation of the slope,
*Placement of the slope protection layer,
*Installation of 450 m of SSG crane rails.
*Berth A1 construction:
*Driving of 84 pcs Ø914.4 mm t=14 mm steel pipe piles (approx. 2,856.00 m),
*Construction of a 160 m x 14 m quay (including precast slabs),
*Placement of underwater fill beneath the quay and formation of the slope,
*Placement of the slope protection layer.
*Berth A2 construction:
*Driving of 202 pcs Ø1016.0 mm t=16 mm steel pipe piles (approx. 7,272.00 m),
*Construction of a 240 m x 24 m quay (including precast slabs),
*Placement of underwater fill beneath the quay and formation of the slope,
*Placement of the slope protection layer.