Scope of Work
*Ro-Ro ramp (525 m²): driving of 28 pcs Ø1016/14 mm steel pipe piles (740 m)
*Piled Jetty-1 (9,600 m²): driving of 366 pcs Ø1321/22 mm steel pipe piles (17,695 m)
*Piled Jetty-2 (6,000 m²): driving of 270 pcs Ø1219/16 mm steel pipe piles (9,556 m)
*6 mooring dolphins: driving of 8 pcs Ø1118/18 mm steel pipe piles (1,898 m)
*16 conveyor line dolphins: driving of 52 pcs Ø1016/16 mm steel pipe piles (2,261 m)
*Construction of reinforced concrete marine structures on driven piles (20,756 m²)