Scope of Work
Quay-7 Berth-14 construction (90×40 m):
- Steel pipe pile driving (127 pcs Ø1371.6 mm, t=20 mm)
- Quay superstructure works (reinforced concrete and rebar)
- Fill protection works
- Cathodic protection of steel pipe piles
- Pile dynamic capacity testing (PDA test)
- Retaining wall construction
- Fire pump station construction
- Installation of port accessories (fenders, bollards, rails, steel stoppers, storm locking brackets, storm mooring brackets and panzerbelt systems)
- Berth-13 bored pile works (43 pcs Ø1200 mm, total 2,170 m bored pile construction)
- Mooring dolphin and catwalk construction:
- Steel pipe pile driving (9 pcs Ø1625.6 mm, t=24 mm)
- Mooring dolphin superstructure works (reinforced concrete and rebar)
- Cathodic protection of steel pipe piles
- Installation of port accessories (catwalk fabrication and installation)