Project Information
- Status Completed
- Location İstanbul, Türkiye
- Year 28 Kasım 2016
- Client İstanbul Üstyapı İnşaat ve Ticaret A.Ş.
Contact Us
Scope of Work
*Piled quay construction:
Driving of 339 pcs Ø914.4 mm, t=12 mm steel pipe piles
- Rock drilling with Soilmec RT3-ST
- All reinforced concrete works for cap beams and slabs for the 580 m long quay structure
- Precast element placement
- 4,000 tons of rebar work
- 10,500 m³ concrete pouring
*Piled jetty construction:
Driving of 266 pcs Ø1117.6 mm, t=18 mm steel pipe piles
- Rock drilling with Wirth PBA 818
- All reinforced concrete works for three separate jetties for City Lines ferries, sea buses and passenger boats
- Precast element placement
- 1,500 tons of rebar work
- 8,000 m³ concrete pouring
*Ground improvement works:
- 13,000 pcs Ø600 mm jet-grout columns of varying lengths in the sea
- Driving of 36 pcs Ø914.4 mm, t=12 mm transition slab support piles in the quay area