Project Information
- Status Completed
- Location Filyos, Zonguldak, Türkiye
- Year 19. 02. 2021
- Client ŞENBAY MAD. TUR. İNŞ. NAK. SAN. VE TİC. A.Ş. & ÖZGÜN YAPI SAN. VE TİC. A.Ş
Contact Us
Scope of Work
Handling, marine driving of 50-inch piles, superstructure works and crown wall concrete construction at Filyos port construction.
- Phase 1
- Driving of 1,345 pcs Ø1270 mm piles, totaling 54,000 m
- 70,000 m³ concrete pouring including superstructure works
- 18,000 m³ crown wall concrete over 100 m length
- Phase 2
- Driving of 1,344 pcs Ø1270 mm piles
- 75,000 m³ concrete pouring including superstructure works
- 50,000 m³ crown wall concrete over 2,450 m length