KYK-1 piled road bridge:

  • Driving of 153 pcs Ø914.4 mm, t=12 mm steel pipe piles (2,100 tons)
  • Drilling of 153 pcs Ø914.4 mm, t=12 mm steel pipe piles (8,600 m)
  • KYK-2 piled road bridge:
  • Driving of 540 pcs Ø914.4 mm, t=12 mm steel pipe piles (7,640 tons)
  • Drilling of 540 pcs Ø914.4 mm, t=12 mm steel pipe piles (31,400 m)
  • KYK-3 piled road bridge:
  • Driving of 121 pcs Ø914.4 mm, t=12 mm steel pipe piles (950 tons)