BOTAS LNG Terminal

BOTAS LNG Terminal

Project Gallery

Project Information

  • Status Completed
  • Location Türkiye
  • Year 27.10.2015
  • Client Boru Hatları ile Petrol Taşıma A.Ş.

Contact Us

Scope of Work

*Driving of 4 pcs Ø2540 mm, t=25–35 mm steel pipe piles with rock drilling and 15 m rock socketing, L=43 m; driving of 10 pcs Ø1524 mm, t=22 mm steel pipe piles with rock drilling and 15 m rock socketing, L=41 m