Project Information
- Status Completed
- Year 30 Ocak 2016
- Client Borusan Lojistik Dağıtım Depolama Taşımacılık ve Ticaret A.Ş.
Contact Us
Scope of Work
*4,000 m² marine fill (vehicle yard and container depot)
*225,000 tons of marine fill
*45,000 tons of armored riprap works
*24,000 m² of infrastructure systems (rainwater drainage, fire water system, electrical cable ducts, lighting poles)
*Excavation, fill and backfill works
*Curb, wire mesh fence and parapet wall along the fill boundary (600 m)