Bati-Roda Port
 West–East Terminals Filling and Infrastructure Construction

Bati-Roda Port

West–East Terminals Filling and Infrastructure Construction

Project Gallery

Project Information

  • Status Completed
  • Year 30 Ocak 2016
  • Client Borusan Lojistik Dağıtım Depolama Taşımacılık ve Ticaret A.Ş.

Contact Us

Scope of Work

*4,000 m² marine fill (vehicle yard and container depot)

*225,000 tons of marine fill

*45,000 tons of armored riprap works

*24,000 m² of infrastructure systems (rainwater drainage, fire water system, electrical cable ducts, lighting poles)

*Excavation, fill and backfill works

*Curb, wire mesh fence and parapet wall along the fill boundary (600 m)