CONSTRUCTION OF COLAKOGLU METALURJI PORT
Project Name Construction of Colakoglu Metalurji Port
Project Location Dilovasi-Izmit, TURKEY
Main Contractor KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Commencement 01.12.2021
PROJECT SCOPE
  • Driving Ø711mm steel tubular piles by total lenght of 360 meter (24 pcs)
  • Driving Ø1016 mm steel tubular piles by total lenght of 740 meter (21 pcs)
  • Driving Ø1219 mm steel tubular piles by total lenght of 455 meter (14 pcs)
  • Driving Ø1422 mm steel tubular piles by total lenght of 2790 meter (90 pcs)
  • Driving Ø1676 mm steel tubular piles by total lenght of 685 meter (21 pcs)
  • Driving Ø1726 mm steel tubular piles by total lenght of 30,90 meter (1 pcs)
  • Driving Ø2032mm steel tubular piles by total lenght of 67 meter (5 pcs)
  • Construction of bored piles of Ø1500 mm by total length of 4257 meter (129 pcs)
  • Construction of bored piles of Ø1000 mm by total length of 1312 meter (41 pcs)
  • Cutting and removal of A1 ano with an area of 2300 m2
  • Production of superstructure and casting concrete of 9.300 m³
  • Installation of Ø3000 mm steel pipes by total length of 86 meter (2 pcs) underwater