KARASU PORT
Project Name KARASU PORT CONSTRUCTION, OPERATION and TRANSFER WORK
Employer  IC ICTAS INSAAT SANAYİ VE TICARET A.S.
Main Contractor KORFEZDENIZ INSAAT TAAH. SAN. VE TIC. LTD. STI.
Commencement  09.11.2015
Completion     02.2017
PROJECT SCOPE
  • Construction of piled quay (9.150 m ²)
  • Driving steel tubular piles with 812,8 mm OD and 14 mm WT with various length (415 no’s) by marine vessels
  • Shore protection
  • Construction of rain water drainage canal (485m)
  •  Construction of infrastructure (990m)
  •  Construction of light house (2 no’s)